Designated outdoor areas
Commercial Smoking Shelters
Plan a shelter for a designated outdoor area. Start with the property’s chosen location, operating policies and project requirements.
Request a Smoking Shelter Quote →

Start with the application
Define the designated-area project
Begin with the property’s chosen location and policies. The shelter procurement should follow the site’s requirements, with placement and configuration reviewed by the responsible project professionals.
01 / APPLICATION
Employee designated areas
Identify the employer’s chosen area, peak use assumptions and property policy. Include the relationship to entrances and other site activities for the project team’s review.
02 / APPLICATION
Managed commercial properties
Clarify whether the owner, facilities manager or occupier is purchasing and maintaining the shelter. Record responsibilities for cleaning, signage and receptacles separately from the structure.
03 / APPLICATION
Replacement or relocation projects
Provide the existing layout and explain why the area is changing. Identify retained paving or equipment and the work needed to remove, relocate or replace existing elements.
For architects & general contractors
Resolve the interfaces before pricing
Bring the site, equipment and purchasing requirements together early. Use these six coordination points to identify what is decided and what still needs review.
01 / COORDINATION
Location
Has the property team confirmed the designated location and applicable requirements?
02 / COORDINATION
Design review
Who is responsible for placement, enclosure and ventilation review?
03 / COORDINATION
Use & upkeep
What usage and maintenance requirements has the owner established?
04 / COORDINATION
Accessories
Are seating, signs and receptacles supplied by the property or requested in the proposal?
05 / COORDINATION
Site works
Who handles foundations, paving, drainage and any electrical work?
06 / COORDINATION
Project type
Is the scope a new structure, replacement or relocation?
Your project brief
What to include in your request
A useful request brings the site information, intended use and purchasing requirements into one brief. Send what is available now and identify anything still being developed.
- Designated-area location and marked-up property plan.
- Owner policies and any requirements supplied by the responsible authority or professional.
- Target footprint, expected use and configuration preferences.
- Photographs and a list of retained or removed equipment.
- Maintenance responsibilities, contractor scope and purchasing schedule.
Scope & responsibilities
What needs to be confirmed in the proposal
No universal setback, ventilation arrangement, smoking-law compliance, LEED credit or health-protection claim is made. Suitability of an enclosure and location requires project-specific review. Seating, receptacles, lighting and site works are not automatic inclusions.
A clear basis for the next step
Ask for the proposal to distinguish included work, optional items, work by others and information still needed. Confirm the required submittals and their timing before purchase. Drawings, calculations, samples, warranties and programme commitments should only be listed as included when the supplier has confirmed them for the project.
Tell us whether you need installation or fabrication supply for installation by others. Delivery, site access and contractor responsibilities are confirmed for the particular project.
Common project questions
Before you request a proposal
How do we establish the permitted location?
The property team should obtain the applicable requirements from the responsible professional or authority. Supply those requirements with the enquiry. A generic shelter page cannot determine a lawful setback for every property.
Can the shelter have side panels or doors?
State the preferred configuration and have the responsible team review its suitability for the location and use. An enclosed arrangement should not be assumed permitted simply because it is marketed as a smoking shelter.
What belongs in the maintenance scope?
Identify the party responsible for cleaning, waste handling, signs and any supplied components. Ask for product-specific maintenance information when the configuration is confirmed; no maintenance-free claim is made here.
Start a project conversation
Bring your site and scope together
Share the project location, intended use and current drawings or photographs. Tell us which decisions you need help moving forward.
